It depends on three things, and we will ask about all three.
Space. If the bay has room for two housings, separate units are usually cheaper and easier to service. If it does not, integration is the only path.
Auxiliary load. If the auxiliary load is small and stable, a 2-in-1 saves a component. If it is large or likely to change, a separate DC/DC gives you more flexibility.
Assembly and supplier management. One module means one mounting point, one harness run, one CAN node and one supplier. If your line is already tight, that alone can justify the integration.
We will tell you when separate units are the better answer. It happens regularly.
Five things, in this order of usefulness.
1. Battery voltage range — nominal and min/max, not just 72 V.
2. Charging power target and the time window available, for example full overnight in 8 hours.
3. Auxiliary load in watts, and the auxiliary voltage (12 V, 24 V, other).
4. Available space for the module — dimensions and mounting position.
5. Target market, because it determines certification before anything else.
With those five we can give an architecture recommendation in one exchange. Without them, the first several emails are usually spent finding them out.
It depends on the market and the product series, so we will be specific rather than general.
EU: CE-marked configurations are available in selected series — currently the 3.3 kW OBC + 1 kW DC/DC 2-in-1 (OD-CE-3D1A series), certificate M.2026.206.C148238 under LVD 2014/35/EU and EMC 2014/30/EU. We will confirm which series you are evaluating before claiming CE.
Other markets: tell us the country and the vehicle category. Some markets require approvals we do not hold, and we will say so at the start rather than after you have placed an order.
We do not hold E-mark (ECE) approval. If your program requires it, we are not the right supplier for that program.
Sample and series production run on the same line with the same test sequence.
Every unit goes through functional testing, CAN validation, protection checks and an aging test before packing, and the test record is traceable to the unit serial number. When you receive a validation sample, ask for its test record.
Compare it against the record that ships with your first series batch. That comparison is the only reliable check, and it is why we keep records per unit rather than per lot.
That is one of the most common ways programs begin with us.
We would ask for two things: the key parameters of your current unit (voltage platform, charging power, auxiliary power, connector type), and the reason you are looking — price, lead time, a field failure, or simply risk management. The reason changes what we propose.
We will then name the closest equivalent in our range and highlight where it differs. Many of our series programs started as a second source and moved to primary after the first validation batch.
Yes — it is a common starting point, and we would rather talk at this stage than after tooling.
What we need is not a drawing but four numbers: the battery voltage range, the charging power you are targeting, the auxiliary load in watts, and the space you can give the module. With those we can recommend an architecture — standalone, 2-in-1 or 3-in-1 — and tell you which one will be cheapest to integrate.
A drawing or a DBC file becomes useful later, at prototype stage. If you do not have them yet, we can work from your platform description.
Echelon on-board chargers and DC/DC converters are used in electric vehicles, electric motorcycles, RVs, unmanned delivery vehicles, golf carts, electric ships and other commercial or specialty electric vehicles, on 48 V to 360 V platforms.
Every unit is aging-tested before delivery. Warranty terms are agreed per program, and quality-related issues are handled with root-cause analysis and after-sales support to protect your long-term project.
Yes. We customize voltage, power rating, outer dimensions, mounting-hole position, connectors, communication protocol (including CAN), heat-dissipation structure and branding, following your whole-vehicle parameters.
Standard models ship from stock or within weeks; customized units follow the agreed prototype and production schedule. We arrange phased shipment to match your monthly production plan, so your line is not interrupted.
Echelon's production capacity is 30,000 units per month. Standard models support low-MOQ sample orders so you can validate compatibility first; customized projects are quoted per program after the technical scheme is confirmed.
Yes. Echelon Energy Technology (Hangzhou) Co., Ltd. manufactures under the IATF 16949 automotive quality management system at its Hangzhou production site, with a capacity of 30,000 units per month. The IATF 16949 certificate and supporting quality documents can be provided during supplier qualification.
In addition, our 3.3 kW OBC + 1 kW DC/DC 2-in-1 integrated module (OD-CE-3D1A series: 72Y, 96Y, 144Y, 320Y, 360Y, 540Y) holds CE marking under EU Low Voltage Directive 2014/35/EU and EMC Directive 2014/30/EU, certified to EN 62368-1:2020, EN 55032:2015/A1:2020, EN 55035:2017/A11:2020 and EN 61000-3-3:2019 (Certificate No. M.2026.206.C148238). Please confirm the applicable certification for each model with our sales team.