Home » Products » OBC+DC/DC+PDU 3-in-1

Products Categories

Contact Us

OBC+DC/DC+PDU 3-in-1

Two series available

Both are CAN-enabled and ship as a single sealed housing. Scroll down for the architecture comparison, the full specification and the FAQ.

Quick answer: a 3-in-1 puts the on-board charger, the DC/DC converter and the high-voltage power distribution unit in one housing. Instead of three boxes, three brackets, three harness runs and three sets of contactors and fuses, the vehicle gets one enclosure with one high-voltage inlet and one CAN node. The trade-off is that a fault in any of the three functions takes the whole unit offline, so the protection set and the thermal design have to cover all of it.

OBC + DC/DC + PDU 3-in-1 module with high-voltage distribution inside the same housing

What moves inside the housing

A 2-in-1 already merges charging and auxiliary power. What it leaves outside the housing is the distribution hardware: the contactors, the fuses, the pre-charge circuit and the high-voltage junction. On a low-volume build that means a separate PDU box, its own bracket and its own harness joints — and every joint is a place to get the torque or the sealing wrong.

A 3-in-1 brings that hardware inside. What changes on the vehicle side:

  • One high-voltage junction instead of two — the charger, the converter and the distribution bus meet inside the module, not at a terminal block.

  • One pre-charge circuit — sized once, for the whole pack, instead of being duplicated at the charger and at the distribution box.

  • One thermal design — the PDU losses are small, but they sit in the same enclosure, so the airflow has to account for them from the start.

  • One part number to stock, wire and trace — a single serial number covers charging, auxiliary power and distribution for the life of the vehicle.

The counter-argument is serviceability. If the distribution hardware fails, a 2-in-1 plus a separate PDU lets you swap the small box. With a 3-in-1 the whole module comes out. On a fleet where uptime is contractual, that difference matters more than the harness saving.

3-in-1 or 2-in-1 plus a separate PDU?

Two configurations solve the same problem. The choice is about where you want the integration boundary, not about which one is newer.

Consideration3-in-12-in-1 + separate PDU
Housing countOneTwo
High-voltage jointsInternal to the moduleOne extra terminal block and harness run
Pre-charge circuitSingle, sharedDuplicated or externally coordinated
Service accessWhole module outDistribution box swapped on its own
Fault isolationAny internal fault disables all three functionsA PDU fault leaves charging intact
Best fitBay volume is the binding constraintUptime and service access come first

If the vehicle already has a distribution box designed and validated, adding a 2-in-1 beside it is the cheaper route. If the bay has one slot and no room for a second enclosure, the 3-in-1 is the only one that fits.

The range at a glance

Two series, three voltage platforms each. Both use the same 90–264 Vac input, so the same module charges on a 220 V supply and survives a 110 V site at reduced power.


ODP-CE-3D1A-72ODP-CE-3D1A-96ODP-CE-3D1A-320Y
Battery voltage72 V DC96 V DC320 V DC
AC input90–264 Vac90–264 Vac90–264 Vac
OBC output voltage50–105 V DC64–128 V DC240–480 V DC
OBC output current0–40 A0–32 A0–10 A
Charging power3300 W @ 220 Vac
1650 W @ 110 Vac
3300 W @ 220 Vac
1650 W @ 110 Vac
3300 W @ 220 Vac
1650 W @ 110 Vac
DC/DC output14 ±0.2 V DC
72 A rated · 1000 W (peak 1200 W)
14 ±0.2 V DC
72 A rated · 1000 W (peak 1200 W)
14 ±0.2 V DC
72 A rated · 1000 W (peak 1200 W)
Efficiency (OBC / DC-DC)≥94% / ≥94%≥94% / ≥94%≥94% / ≥94%
CoolingAirAirAir
CommunicationCAN busCAN busCAN bus

ODP-CF-6G2F-72ODP-CF-6G2F-96ODP-CF-6G2F-320
Battery voltage72 V DC96 V DC320 V DC
AC input90–264 Vac90–264 Vac90–264 Vac
OBC output voltage50–100 V DC64–128 V DC240–480 V DC
OBC output current0–80 A0–64 A0–20 A
Charging power6600 W @ 220 Vac · ≥94%6600 W @ 220 Vac · ≥94%6600 W @ 220 Vac · ≥94%
DC/DC output14 ±0.2 V DC · 72 A
2500 W rated / 3000 W peak (6 min) · ≥93%
14 ±0.2 V DC · 72 A
2500 W rated / 3000 W peak (6 min) · ≥93%
14 ±0.2 V DC · 72 A
2500 W rated / 3000 W peak (6 min) · ≥93%
Inverter output220 Vac · 6000 VA220 Vac · 6000 VA220 Vac · 6000 VA
Inverter efficiency≥92% · 50 Hz ±0.5 Hz≥92% · 50 Hz ±0.5 Hz≥92% · 50 Hz ±0.5 Hz
CoolingLiquidLiquidLiquid
CommunicationCAN busCAN busCAN bus

Three details are easy to misread. First, the 6.6 kW figure applies to a 220–240 Vac supply — on 110 Vac the same module delivers half the charging power. Second, the DC/DC peak figures are short-term (6 min at 3 kW on the ODP-CF series), for compressor start-up and similar transients, not continuous draw. Third, the 6 kVA inverter on the ODP-CF series is a fourth function in the same housing: if the vehicle runs AC tools or a refrigeration unit, that is the reason to pick this series over the air-cooled one.

How to specify a 3-in-1 in three steps

Step 1 — confirm the pack window and the distribution scope

Start with the pack: nominal and maximum voltage, and the charge power you need. Then list what the PDU has to switch and protect — contactor rating, fuse values, pre-charge resistor and the number of high-voltage outputs. A 3-in-1 is specified around that list, so an incomplete list is the usual cause of a late redesign.

Step 2 — size the DC/DC from the auxiliary budget

Add the continuous low-voltage draw at worst case: work lights, wipers, cabin fan, controller and BMS supply, telematics, plus any DC/AC inverter. Keep the continuous total under the rated figure and treat the peak window as a reserve for motor and compressor start-ups, not as headroom you can plan to use.

Step 3 — choose air or liquid cooling from the bay, not the power level

The ODP-CE series is air-cooled and suits an open bay with its own airflow. The ODP-CF series is liquid-cooled and suits a sealed compartment or a continuous duty cycle. Power level alone does not decide it: a 3.3 kW module in a sealed box will run hotter than a 6.6 kW module on a cooled plate.

What to confirm before you put a part number on a drawing

  • Ingress protection — ask for the IP rating of the specific model and mounting position in writing. It is not uniform across the range.

  • CAN interface — both series use CAN for status, fault reporting and vehicle integration, but the message set is configured per programme. Ask for the DBC.

  • PDU configuration — contactor rating, fuse values and output count are programme-specific. Two vehicles with the same model code can carry different distribution hardware.

  • Certification scope — CE applies to the configurations that carry it. We do not hold ECE approval; if the programme needs E-mark, say so at RFQ rather than after the sample.

Where a 3-in-1 fits

Not defined by vehicle type. Three conditions decide it:

  • One bay, one enclosure — the vehicle cannot physically take a charger, a converter and a distribution box as separate units

  • A high-voltage bus that needs switching — contactors, fusing and pre-charge are part of the vehicle architecture, not an afterthought

  • 48–480 V pack — the charger output window must span your pack from empty to full

Body shape, duty cycle and market change the connector and the CAN map, not whether the architecture works. If the bay has room for two or three separate boxes and uptime is the priority, a 2-in-1 plus a separate PDU is the better answer — we build those as well.

Common programmes

Light commercial and last-mile vans
Light commercial and last-mile vans
Refrigeration, lift gates and telematics keep drawing auxiliary power while the pack charges — and the bay has room for one enclosure, not three.
Read the guide →
Engineering, agricultural and specialty vehicles
Engineering, agricultural and specialty vehicles
Short break windows and a real auxiliary load, on chassis with no spare volume for a separate PDU box.
Read the guide →
Off-road ATV and UTV
Off-road ATV and UTV
72–96 V packs, wash-down and continuous vibration — every external high-voltage joint is a place to get sealing wrong.
Read the guide →
Autonomous delivery robots
Autonomous delivery robots
Charging triggered at a docking point, with the auxiliary rail for controllers and sensors, and no operator to swap a failed box.
Read the guide →
Electric boats and marine
Electric boats and marine
A short high-voltage run inside a wet compartment, where the fewer external terminations the better.
Read the guide →
2W / 3W and e-motorcycles
2W / 3W and e-motorcycles
Where the vehicle has a high-voltage bus to switch and no room for anything but a single module.
Read the guide →

Also in series: Airport ground support · Forklifts and AGVs · Sanitation vehicles · RVs and campers — and vehicles not listed here.

Send the pack voltage and the PDU scope and we will say whether one of the two series fits, or whether the programme needs a separate distribution box.

Frequently asked questions

Is a 3-in-1 always better than a 2-in-1 plus a separate PDU?

No. It is better when the bay volume is the binding constraint. It is worse when service access or fault isolation matters more, because one internal fault disables charging, auxiliary power and distribution together. On contractual-uptime fleets the separate-PDU layout often wins on total cost of ownership even though it costs more to build.

Does the PDU inside the 3-in-1 replace my vehicle distribution box?

It replaces the part of it that lives between the charger, the converter and the pack — contactors, fusing and pre-charge for those paths. It does not distribute power to the whole vehicle. If you need full high-voltage distribution, the PDU configuration is specified per programme and should be agreed at RFQ.

Can I get 6.6 kW on a 110 V supply?

No. The 6.6 kW rating applies to a 220–240 Vac input. On 110 Vac the same module delivers roughly half. If your target market is 110 V only, size the vehicle charge time from the reduced figure rather than the nameplate.

Do I need liquid cooling for the 6.6 kW series?

The ODP-CF series is liquid-cooled as built — it is not an option you can drop. The choice is between series, not within one: the air-cooled ODP-CE series suits an open bay with airflow, the liquid-cooled ODP-CF series suits a sealed compartment or continuous duty.

How do I get a quote?

Send four things: nominal and maximum pack voltage, pack capacity in kWh or Ah, the continuous auxiliary load in watts, and the list of what the PDU must switch and protect. Add a DBC file or a bay drawing if you have them. With those we can name a model, state the charge time it delivers and flag whether the thermal path is realistic.

Next step

Send the pack voltage and the PDU scope and we will shortlist which of the two series fits — or say plainly if the programme is better served by a 2-in-1 plus a separate distribution box.

Get in Touch

Quick Links

Support

Product Category

Contact Us

Tel: +86-181 14665311
Add: Room 301, 3rd Floor, Building 2, No.1 Luoyang Road, Renhe Sub-district, Yuhang District, Hangzhou
 
Copyright © 2026 Echelon Energy Technology(Hangzhou) Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy