100% morning readiness without replacing the whole fleet

A European resort operator runs 60 electric golf carts across two 18-hole courses, charging overnight in an open-sided barn. During peak season, eight to ten carts per week were not fully charged by the 6 a.m. start, and the operator was preparing to replace all 60 chargers.

The challenge

The chargers were not failing. They were finishing too late.

Our diagnosis

We logged charging start times, starting state of charge and completion times for two weeks.

Charging typically began at 11 p.m. when the barn was locked, which gave a seven-hour window. A 72 V / 100 Ah pack with a 3.3 kW charger needs roughly six hours from 20 percent, but only if it actually starts at 20 percent. Carts returning at 10 to 15 percent needed more, and cold autumn mornings added further time on top.

The problem was sizing against the pack rather than against the window. And only the busiest carts were actually affected.

What we did

1. Rather than replacing all 60 chargers, we identified the 20 carts with the heaviest daily use.

2. Moved those to 6.6 kW OBC units (PO-AB-6G series), cutting their charging time to about three hours.

3. Left the remaining 40 carts on their existing 3.3 kW units.

4. Added a staggered start schedule so the barn supply was not loaded simultaneously.

Result

Morning readiness went from roughly 85 percent to 100 percent. Twenty chargers were replaced instead of the proposed 60, at roughly one third of the planned cost. Peak electrical demand stayed unchanged because the start times were staggered rather than simultaneous.

Client feedback

"We were about to buy 60 chargers. We needed 20." — Operations director

If you have a similar problem

Tell us fleet size, pack voltage and capacity, and the hours actually available for charging. We will model the charging window before quoting anything, because in a fleet the correct charger is decided by the schedule rather than by the pack label.

Get in Touch

Quick Links

Support

Product Category

Contact Us

Tel: +86-181 14665311
Add: Room 301, 3rd Floor, Building 2, No.1 Luoyang Road, Renhe Sub-district, Yuhang District, Hangzhou
 
Copyright © 2026 Echelon Energy Technology(Hangzhou) Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy