Two housings, one bay

A European low-speed vehicle manufacturer builds 72 V four-wheel vehicles for resort and campus use, selling through a dealer network in four countries. The vehicle had been designed with a standalone 3.3 kW on-board charger and a separate 1 kW DC/DC converter. Both worked.

The challenge

The problem was not electrical. It was assembly.

1. The rear bay could not fit both housings without relocating the battery box rearward, which upset weight distribution.

2. Each vehicle needed two high-voltage harness runs, each with its own connector pair.

3. The controller firmware had to manage two CAN nodes with different message sets.

4. Two suppliers meant two incoming inspection routines and two lead times.

The assembly line was losing roughly 25 minutes per vehicle to routing and connecting the second unit.

Our diagnosis

The electrical design was sound. The constraint was packaging and assembly time. The customer had initially framed the request as a purchasing question, asking us to find a cheaper DC/DC converter. Our read was that the cost they cared about was on the line, not on the bill of materials.

What we did

1. Proposed the 3.3 kW OBC + 1 kW DC/DC 2-in-1 (OD-CE-3D1A series) instead of sourcing a cheaper standalone converter.

2. Matched the existing mounting hole pattern so the battery box did not move.

3. Consolidated the two CAN node definitions into one node and supplied the updated DBC file.

4. Kept the output connector type from the original DC/DC so the existing harness end could be reused.

Result

Housings mounted in the rear bay: two became one. High-voltage harness runs: two became one. CAN nodes configured: two became one. Incoming inspection routines: two suppliers became one. Harness length fell as a direct consequence of the single run.

Assembly time per vehicle dropped by about 25 minutes, and the vehicle passed re-validation without changes to the battery box or weight distribution.

Client feedback

"We were looking for a cheaper converter. What we got was one less thing on the line." — Engineering lead

If you have a similar problem

If your vehicle is designed with separate units and the real constraint is packaging or assembly time, tell us the bay dimensions and your current harness routing. We will tell you whether integration is feasible without structural changes, and we will say so when it is not.

Get in Touch

Quick Links

Support

Product Category

Contact Us

Tel: +86-181 14665311
Add: Room 301, 3rd Floor, Building 2, No.1 Luoyang Road, Renhe Sub-district, Yuhang District, Hangzhou
 
Copyright © 2026 Echelon Energy Technology(Hangzhou) Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy