A 4% failure rate solved by moving the module 120 mm

An Eastern European agricultural UTV manufacturer builds 72 V utility vehicles for farm and forestry work. Around four percent of units per year came back with charger failures, all of them water ingress, mostly reported in spring after the wash-down season.

The challenge

The charger was correctly rated and had passed ingress testing, so the manufacturer's position was that the product was faulty. From their side that position was reasonable: the specification said what it said, and the unit did not survive.

Our diagnosis

We asked for the mounting position rather than the test report.

The module was mounted on an exposed frame rail behind the rear wheel, with the connector face oriented toward the wheel. The unit met its ingress rating under the defined test conditions, but a pressure washer directed at the connector face from close range exceeds those conditions by a wide margin. The failure was in the connector seal, not in the housing.

What we did

1. Did not change the electronics at all.

2. Changed the mounting orientation so the connector face pointed downward and inward, roughly 120 mm from where it had been.

3. Supplied a different connector type with a secondary seal.

4. Provided a one-page mounting guidance document for the assembly line.

Result

Annual field failure rate fell from around four percent to under one percent. No electronics changed. Tooling cost was limited to the new bracket.

The interesting part is that this was never a warranty question. Nobody had built a defective unit. The unit was installed in a position where the wash-down pattern hit the one surface that could not take it, and moving the module and the connector solved it.

Client feedback

"We expected a warranty argument. We got a mounting drawing." — Quality manager

If you have a similar problem

Send us a photo of the mounting position and a description of the wash-down regime. Ingress failures are usually a geometry problem, and geometry is cheap to fix compared with replacing a housing or changing a rating.

Get in Touch

Quick Links

Support

Product Category

Contact Us

Tel: +86-181 14665311
Add: Room 301, 3rd Floor, Building 2, No.1 Luoyang Road, Renhe Sub-district, Yuhang District, Hangzhou
 
Copyright © 2026 Echelon Energy Technology(Hangzhou) Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy